Guide · Home Build · Change orders
Change Orders: Price Them Before the Work, Log Them the Same Day
Advertisement
Ad slot — top of guide
Reserved for a Google AdSense unit. Free users see ads here; Pro members see none.
Short answer: A change order is any change to the agreed scope after signing — an added outlet, a moved wall, a upgraded window. Each one changes the price. The discipline that saves budgets: no change gets built before its price is agreed in writing, and every agreed change lands in the budget the same day.
Worked example: small changes, real money
The sample build carries $2,050 of change orders so far ($1,200 foundation, $850 plumbing) inside its $458,500 projected total. Individually trivial — but change orders compound: ten "small" $850 changes are $8,500, and late-stage changes (after drywall) routinely cost 2–3× the same change made at framing. The Home Build Tracker keeps a change-order column per line so the running total is never a surprise.
A change-order habit that works
- Ask "what does that do to the total?" — out loud, every time, before approving.
- Batch small changes. One priced change order beats five verbal ones.
- Trade, don't just add. Funding an upgrade by de-scoping something else keeps the projected total honest.
Advertisement
Ad slot — middle of guide
Reserved for a Google AdSense unit. Free users see ads here; Pro members see none.
FAQ
Are change orders marked up?
Often — many contracts apply the builder's fee or a stated markup to changes. Know your contract's rule; the tracker logs the agreed all-in price either way.
What about changes the builder suggests?
Some are genuine improvements, some are scope the original price should have covered. If it's in the plans, it's not a change — check the drawings before signing the order.
Can a change order reduce the price?
Yes — de-scoping creates a credit change order (negative). Log it the same way; credits forgotten are credits lost.
Keep the running total visible: every change lands in the projected cost immediately.
Open Home BuildSee Pro — $5/moAdvertisement
Ad slot — bottom of guide
Reserved for a Google AdSense unit. Free users see ads here; Pro members see none.